Cutting Through Challenges: A New Approach to Multistring Conductor Cutting

Cutting Through Challenges: A New Approach to Multistring Conductor Cutting

Safety is of the essence. If you succeed in improving a technique so that a task can be done in half the time, then the exposure time for all workers and the risk of an incident is also cut in half. During cutting tests, we are always amazed by the great cutting...
Offshore Pile Cutting and Grout Removal – SUBMAR’s Engineering Approach

Offshore Pile Cutting and Grout Removal – SUBMAR’s Engineering Approach

At a depth of 40 metres, a series of platform piles stick out of the seafloor. SUBMAR was awarded the scope of removing these piles but there is a problem. The piles have been cut over a metre above the seafloor and are packed with bone-hard grout. Before we can cut...
Building Expertise: Submar Employees Master High-Pressure Technology

Building Expertise: Submar Employees Master High-Pressure Technology

To ensure the safe and effective operation of our advanced high-pressure and ultra-high-pressure pumps, Submar has initiated comprehensive training for all employees. Our first group of team members recently completed specialized training at Hammelmann, a globally...
Multistring Conductor Cutting: A Unique Solution for Offshore Well Decommissioning

Multistring Conductor Cutting: A Unique Solution for Offshore Well Decommissioning

Some time ago, a series of wells were cut and removed from a platform. One well presented a challenge. The 30’ conductor was found to have a steel cage around it. And this posed problems during decommissioning. As a result, the well could not be removed through the...